Voyager In Space

 

Galaxy Banner Image
VOYAGER
 

Voyager LECP Data Analysis Handbook

 

Calibrations and Channel Definitions

 

MEMO TO: Dr. Krimigis and D. Peletier

 

FROM: E. Tums

 

RE: Request by D. Johnson to change LECP cruise mode format

 

Date: May 29, 1975

 

Attached are two suggested cruise mode formats, one in a 25 x 8 arrangement and another in a 50 x 8 arrangement.  To facilitate making choices or suggesting modifications I have also attached:  1) a copy of the latest cruise mode format which was not suitable for implementation by FDS; 2) cruise mode rate group arrangement showing which rates are in each group; and 3) a table listing the rate telemetry allocation for each of the three formats and the allocation as initially requested.

 

The format changes have no impact on the hardware design and the choice has to be made on the basis of desired readout frequencies.  However, testing would be less time consuming for the smaller (i.e., 25 x 8) format.  Also the smaller format will probably be preferred by the FDS designers.  For these reasons I recommend that the 25 x 8 format be used if the readout telemetry allocation is acceptable.

 

The motor step rate has to be adjusted so that motor steps after an integral number of formats have been read out.

 

Rate Telemetry Allocations

 

Rate
Group
Initial
Request (%)
Present
Format (%)
8 x 25
Format (%)
8 x 50
Format (%)
1 25.543

25.0

25.0 25.0
2 25.543 25.0 25.0 25.0
3 12.771 12.5 12.5 12.5
4 07.663 6.25 12.5 6.25
5 07.663 6.25 5.0 6.25
6 07.663 6.25 5.0 6.25
7 02.554 3.125 2.5 6.25
8 02.554 3.125 2.5 2.5
9 02.554 3.125 2.5 2.5
10 02.554 3.125 2.5 2.5
11 00.639 1.563 1.0 1.25
12 00.639 1.563 1.0 1.25
13 00.639 1.563 1.0 0.5
14 00.255 0.39 0.5 0.5
15 00.255 0.39 0.5 0.5
16 00.255 0.39 0.5 0.5
17 00.255 0.39 0.5 0.5

 

8 x 50 Matrix

 

1 2 3 4 1 2 6 8
" " " 5 " " 7 9
" " " 4 " " 6 10
" " " 5 " " 7 11
" " " 4 " " 6 13
" " " 5 " " 7 8
" " " 4 " " 6 9
" " " 5 " " 7 10
" " " 4 " " 6 12
" " " 5 " " 7 14
" " " 4 " " 6 8
" " " 5 " " 7 9
" " " 4 " " 6 10
" " " 5 " " 7 11
" " " 4 " " 6 15
" " " 5 " " 7 8
" " " 4 " " 6 9
" " " 5 " " 7 10
" " " 4 " " 6 12
" " " 5 " " 7 16
" " " 4 " " 6 8
" " " 5 " " 7 9
" " " 4 " " 6 10
" " " 5 " " 7 11
" " " 4 " " 6 17
" " " 5 " " 7 8
" " " 4 " " 6 9
" " " 5 " " 7 10
" " " 4 " " 6 12
" " " 5 " " 7 13
" " " 4 " " 6 8
" " " 5 " " 7 9
" " " 4 " " 6 10
" " " 5 " " 7 11
" " " 4 " " 6 14
" " " 5 " " 7 8
" " " 4 " " 6 9
" " " 5 " " 7 10
" " " 4 " " 6 12
" " " 5 " " 7 15
" " " 4 " " 6 8
" " " 5 " " 7 9
" " " 4 " " 6 10
" " " 5 " " 7 11
" " " 4 " " 6 16
" " " 5 " " 7 8
" " " 4 " " 6 9
" " " 5 " " 7 10
" " " 4 " " 6 12
" " " 5 " " 7 17

 

8 x 15 Matrix

 

1 2 3 5 1 2 4 7
" " " 6 " " " 13
" " " 8 " " " 5
" " " 9 " " " 6
" " " 11 " " " 10
" " " 5 " " " 7
" " " 6 " " " 14
" " " 8 " " " 5
" " " 9 " " " 6
" " " 12 " " " 10
" " " 5 " " " 7
" " " 6 " " " 15
" " " 8 " " " 5
" " " 9 " " " 6
" " " 13 " " " 10
" " " 5 " " " 7
" " " 6 " " " 11
" " " 8 " " " 5
" " " 9 " " " 6
" " " 16 " " " 10
" " " 5 " " " 7
" " " 6 " " " 12
" " " 8 " " " 5
" " " 9 " " " 6
" " " 17 " " " 10

 

(8 x 25) Blocks x 128 Bits/Block x 1/128 Sec/Bit (BIT RATE) = 187.5 Sec (SEQUENCE TIME)

 

1 4   10 50
2 10   11 54
3 14   12 60
4 20   13 64
5 24   14 70
6 30   15 74
7 34   16 100
8 40   17 104
9 44      

 


 

Return to Calibrations main page.

Return to Voyager LECP Data Analysis Handbook Table of Contents.
Return to Fundamental Technologies Home Page.


Updated 8/9/19, Cameron Crane

VOYAGER 1 ELAPSED TIME

--:--:--:--
Days: Hours: Minutes: Seconds

*Since official launch
September 5, 1977, 12:56:00:00 UTC

VOYAGER 2 ELAPSED TIME

--:--:--:--
Days: Hours: Minutes: Seconds

*Since official launch
August 20, 1977, 14:29:00:00 UTC

QUICK FACTS

Manufacturer: Voyagers 1 and 2 were built in the Jet Propulsion Laboratory in Southern California.

Mission Duration: 40+ years have elapsed for both Voyager 1 and Voyager 2 (both are ongoing).

Destination: Their original destinations were Saturn and Jupiter. Their current destination is interstellar space.